Hydro-Dyne Engineering Inc

Remanufacturing Process

Rebuild Screen
By now the screen has been thoroughly cleaned and completely disassembled. The tracks have been removed and new tracks have been welded in place. The motor and gearbox have been rebuilt and painted or replaced. All the replacement parts have been fabricated by the machine shop.
Tracks Replaced     Drive Sprocket Alignment Lacing
The grid is laced with all new spacers, axles, dogbones (replace "rollers"), closure links, and hardware. After the grid is laced the drive sprockets are aligned and inserted, the side panel is attached. The screen has been completely remanufactured and is ready for final adjustments and testing before shipping.

Copyright © 2007 Hydro-Dyne Inc. All rights reserved.